Location:

The site for Jalpaiguri New Industrial Growth Centre is located  by the side of State Highway 12A connecting Siliguri (29 KM) and Jalpaiguri (21 KM). This Growth Centre is being developed in phases. In first phase 341 acres is being developed.

Infrastructre being arranged:

  • Uninterrupted power supply through WBSEB substation to be located within the growth centre.

  • State of the Art telecommunication systems.

  • 20 mtr. R.O.W. internal roads network.

  • 24 hours water supply through WBIIDC's own supply network.

  • Integrated drainage network.

  • Street lights over the internal roads.

  • Common Service Centre.

  • Arrangement for medical, banking, postal services etc.

Land Premium:

Rs. 10 lacs/acre

Land is allotted on as is where basis.

Position as on 31st March, 2004